m

This is Aalto. A Professional theme for
architects, construction and interior designers

Call us on +651 464 033 04

531 West Avenue, NY

Mon - Sat 8 AM - 8 PM

Top

Tunnel safety plan phase 2 – Spea Engineering spa

Category:
Project:

Tunnel safety plan phase 2

Client:

Spea Engineering SPA

Location:

A1 – A9 – A16 – A26

Services:

Esecutivo - DL support tunnels - ASPI tunnel safety

Year:

2016 – still in progress

The project aims to adapt the existing tunnels to the minimum safety requirements set by the European directives. The interventions are: construction of the drainage system and collection tanks outside the tunnels, construction of the fire-fighting water system and pumping stations.

Date: